Fleet EV Charging Leeds

Optima Electrical installs multi-point EV charging systems for business fleets across Leeds. Van fleets, company car fleets, and mixed vehicle fleets — we design and install charging infrastructure that keeps your operation moving.

We are OZEV-approved and NICEIC-accredited, which means we handle everything from electrical infrastructure and 3-phase upgrades through to chargepoint installation and grant applications.

Multi-Point Fleet Charging for Leeds Businesses

Fleet charging is more complex than fitting a single wallbox at home. Multiple vehicles often need to charge simultaneously overnight without overloading your power supply.

We design and install fleet charging systems for depots, yards, car parks, and commercial premises across Leeds. Whether you run a fleet of electric vans from an industrial unit in Cross Green or manage company cars from Leeds city centre offices, we tailor your setup to your fleet, schedule, and electrical supply.

Our fleet installations include:

  • Wall-mounted and floor-standing chargepoints
  • Cable management and containment
  • Dedicated circuit protection
  • Power distribution upgrades if required

 

Multi-Point Fleet Charging for Leeds Businesses
Grants & Funding — Deadline 31 March 2026

Grants & Funding — Extended to March 2027

Government grants can cover a significant portion of fleet charging costs. Applications must be submitted before 31 March 2027.

  • EV Infrastructure Grant: Covers 75% of building and installation costs for multiple chargepoints, up to £15,000 per site. Claimable across up to 5 sites (up to £75,000 total) for SMEs under 250 employees.
  • Workplace Charging Scheme (WCS): Covers 75% of chargepoint purchase and installation, up to £350 per socket, max 40 sockets per organisation.
  • Plug-in Van Grant: Up to £2,500 for small electric vans and £5,000 for larger vans.

These grants can be combined. As an OZEV-authorised installer, Optima manages the full application process. Act now — the funding window closes 31 March 2027.

Smart Charging & Load Management

nstalling multiple chargers on one site puts demand on your electrical supply. Without proper planning, you risk tripped breakers, slow charging, or expensive grid upgrades.

We assess your existing supply and design a layout that works within your capacity, including:

  • Load balancing: Share available power intelligently across multiple vehicles
  • Scheduled charging: Optimise off-peak electricity usage
  • 3-phase supply assessment/upgrades: Ensure your site can handle high loads

As electrical contractors — not just EV installers — we can perform all required infrastructure upgrades in-house, with no subcontractors or delays.

Smart Charging & Load Management

Why Optima for Fleet EV Charging

Most EV installers bolt chargers to a wall. We build the electrical infrastructure behind them.
We combine technical knowledge, local insight, and funding expertise to deliver fleet charging solutions that truly work for your business.

Grants will not be available for much longer — book your free site survey today.

or complete the form below.

Request Fleet EV Charging in Leeds